Fabricated Steel Tube Base for the Laboratory Furnace Industry
ADM Custom Metal has manufactured precision sheet metal fabrications since 1983. A customer in the production and laboratory furnace industry needed a structural tube and sheet metal base weldment, and our company was contracted to complete the project.
Several types of tubing and sheet steel were used in this fabrication. Expert fabricators created this frame using our punch, press brake, shear, horizontal bandsaw, drill press, and mig-welding machinery. This weldment was made as the base structure for a separate stainless steel furnace assembly (not shown). As pictured, the completed base measured 54” long, 38” deep, and 40” high, with tightest tolerances of ± 0.010” for the sheet metal components and ± 0.032 for the tubular frame. This unit is put through dimensional and visual inspections after construction and is fully assembled prior to painting. When completed, the base is finished with black polyurethane paint and delivered to our client in New Jersey. This project was completed in its entirety in just three weeks, fully meeting our customer's delivery requirements and dimensional specifications.
For more information about this project, please see the following table or contact us directly.
Fabricated Steel Tube Base Project Highlights:
- Product Name
- Furnace Base
- Capabilities Applied/Processes
-
- Primary:
Punching
Forming
Saw-Cutting
Shearing
Drilling
Tapping
Welding
Sanding - Secondary:
Spray Paint Finishing
- Primary:
- Product Description
- Structural tube and sheet metal base weldment
- Equipment Used to Manufacture Part
- Trumpf Punch
Steel Master Wet Style 37” Belt Sander
Trumpf Press Brake
Cincinnati Shear
Do-All Horizontal Saw
Drill Press
Tapping Head
MIG Welder
Hand-Held Grinder/Sander
- Overall Part Dimensions
- Length: 54”
Depth: 38”
Height: 40”
- Tightest Tolerances
- ± 0.010” Sheet Metal
± 0.032 Tubular Frame
- Material Used
- 11 GA CRS Floor
16 GA CRS Left Side Panel
16 GA Perforated Sheet Inner Panel
1 x 1 x 1/8 Wall HRPO Tube
1 x 2 x 1/8 Wall HRPO Tube
- Material Finish
- Spray Painted Black Polyurethane
- Additional Facts
- This is the base structure for a furnace assembly which also includes parts made from 18, 16, 11 & 7ga #4 polished stainless steels and carbon steels
- In Process Testing/Inspection Performed
- Full Assembly Inspection Prior to Painting
Dimensional Inspection
Visual Inspection
- Industries Served
- Production
Laboratory Furnace
- Volume
- 1 Piece per Order
- Delivery/Turnaround Time
- 3 Weeks
- Delivery Location
- New Jersey
- Standards Met
- Customer Specifications
2D CAD Drawing
OSHA Requirements